Alkin Compressors INC, 32 noble st. Room G-1 Newark, NJ 07093
alkin@alkin.com.tr
Alkın Türkçe
Alkın Türkçe
R&D
R&D
PROJECTS
DEFENCE INDUSTRY PROJECTS
  • R&D Center
  • Nitrogen Generation System
  • High Pressure Water Cooled Air Compressor
  • National Ship (MILGEM) Project
  • Breathing Air Quality Monitor (ALK-BAQ)
  • Multi Purpose Amphibious Assault Ship (LHD) Project
  • Amphibious Ship (LST) Project
  • New Type Patrol Boat (YTKB) Project
  • Test and Training Vessel (TVEG) Project
  • Emergency Response and Diving Training Boat (ACMB) Project
  • Test and Training Vessel (TVEG) Project


    In order to meet the requirements of the Turkish Naval Forces, 2 pcs. W4 High Pressure Breathing Air Compressors and 2 Filling Stations were delivered by ALKIN COMPRESSOR within the scope of TVEG project, which was designed on the basis of MILGEM project island class corvette platform.

            W4-15-230-FP6M

    • Capacity                : 594 l/min
    • Working pressure  : 230 bar
    • Motor power          : 15 kW

            Filling Station

    • Capacity                : 1000 l/min
    • Working pressure  : 350 bar
    • Tube number         : 3